Project Date:
May 11, 2020
Project Description:
Re-Roofing of the Hoquiam High School. The high school was built in 1968 and features a two-story Mansard Roof. The existing roof shakes are the original cedar shakes sourced from a local mill. The mansard roofs of all buildings will be re-shingled with a new composite that closely resembles the original.